Phase V - Maximize Shipping Capability

$42,800,000 Capital Improvement
Maximize Shipping Capability 700,000 tons

  • Gerdau MACSTEEL-MI
  • Upgrade scrap handling and weighing systems
  • Increase cast size 195mm caster
  • Auto mold level control
  • Upgrade bar handling
  • Inspection enhancements
  • Mill crane
  • Gerdau MACSTEEL - AR
  • Improve EAF lime system
  • Increase caster metallurgical height
  • Increase caster cooling capacity
  • Inspection enhacements
  • Specialized Heat Treatment furnace
  • Over $19M will be invested in MAC-MI
  • Over $23M will be invested in MAC-AR
  • MAC-AR will increase capacity from 375,000 tpy to 420,000 tpy
  • MAC-MI will increase capacity from 245,000 tpy to 280,000 tpy
  • This Phase V will smooth all operations for maximum effectiveness to handle the higher volumes.
  • Hot metal logistics will be improved with new ladle reconditioning areas, pre-heaters and furnace current conducting arms.
  • Caster water systems will be upgraded or enlarged and added cooling capacity installed.
  • Material handling will be upgraded.

Next Phase

Gerdau MACSTEEL Home | Gerdau MACSTEEL Atmosphere Annealing
Profile | Capabilities | Quality | Engineered Bar Products | NitroSteel Division
Heating Treating Division | Capital Improvement | News Releases/Hot Links | Site Map | Contact Info | Metallurgical Data Book