Phase IV - Double MACPLUS Cold Finish Cap.

$28,000,000 Capital Improvements
Double MACPLUS Cold Finish Capacity

  • Gerdau MACSTEEL-MI
  • Increase Cold Finish mill building
  • Install second Daisho bar turning line with burnisher
  • Add mill crane
  • Install second Circo-Flux Inspection Line

  • Gerdau MACSTEEL-IN
  • Third quench and temper line added
  • Double factory space
  • Gerdau MACSTEEL - AR
  • New Cold Finish building
  • Install second Daisho bar turning line with burnisher
  • Install second Circo-Flux Inspection Line
  • New Heat Treatment Furnace

  • Gerdau MACSTEEL-WI
  • New grinding capabilities added to NITROSTEEL division
  • Over $18M has been invested in MAC-MI
  • Nearly $10M has been invested in MAC-AR
  • Phase IV will achieve its objective of producing 180,000 tpy of MACPLUS premium Turned and Polished Engineered Steel Bars.
  • Automatic bar end chamfering will be installed.
  • Forester Circograph surface inspection equipment will be installed to 100% verify the surface quality as Defect Free.
  • MAC-AR has installed a new heat treat furnace that will be capable of solution heat treatment of 52100 steels, to dissolve carbides and spherodize annealing.
  • Gerdau MACSTEEL will also increase our bar straightening capability with two additional bar straighteners.
  • The Heat Treat Division will add another Induction Quench and Temper Line while nearly doubling factory space.
  • NitroSteel will add grinding capabilities.

Next Phase

Gerdau MACSTEEL Home | Gerdau MACSTEEL Atmosphere Annealing
Profile | Capabilities | Quality | Engineered Bar Products | NitroSteel Division
Heating Treating Division | Capital Improvement | News Releases/Hot Links | Site Map | Contact Info | Metallurgical Data Book