| |
Phase II - Rolling and Finishing Expansion
$52,100,000 Capital Improvements
Increase Shipping Capacity to 550,000 tons
- Gerdau MACSTEEL-MI
- New MACPLUS Line
- Add four rolling mill stand
- Kocks precision size mill
- New Cooling beds
- Circo-Flux Testing
- Heat Treatment upgrade
|
- Gerdau MACSTEEL - AR
- Extensive rolling mill upgrade
- Kocks precision size mill
- Electro-magnetic stirring
- Cooling bed upgrade
- Circo-Flux Testing
- New Heat Treatment Bldg.
|
- MAC-AR increased capacity from 305,000 tpy to 340,000 tpy
- MAC-MI increased capacity from 180,000 tpy to 210,000 tpy
- Phase II achieved its objective of allowing us to make Precision Hot Rolled Engineered Steel Bars to less than half standard tolerance.
- We are running within quarter standard tolerance on our MACGOLD product.
- $39M was spent at MAC-AR and $13M was spent at MAC-MI on this product upgrade.
- Bar surface inspection "Foerster Circoflux" testing equipment was added to our inspection lines to provide world-class capability to certify the quality of our bars to the smallest flaw size.
|
Next Phase
Gerdau MACSTEEL Home | Gerdau MACSTEEL Atmosphere Annealing
Profile |
Capabilities |
Quality |
Engineered Bar Products |
NitroSteel Division
Heating Treating Division |
Capital Improvement |
News Releases/Hot Links |
Site Map |
Contact Info |
Metallurgical Data Book
|